{
 "id": "dornych-quarter-2026-v2",
 "name": "Dornych planned finished redevelopment",
 "model": "Authored parametric reconstruction generated by lib/game/dornych/ from public/data/dornych-quarter.json; all surfaces are authored geometry and procedural materials, with no render or plan pixels in runtime assets",
 "designReferences": [
  {
   "url": "https://dornych.cz/",
   "owner": "Crestyl",
   "revision": "2026.09.03.5 official site assets",
   "use": "Research-only appearance references (facade systems, canopy, landscape); proprietary images are not runtime textures, and no brand lettering or shop names are reproduced"
  },
  {
   "url": "https://dornych.cz/kancelare/",
   "owner": "Crestyl",
   "use": "Developer 5.NP floor plans of offices B–E: upper-floor outlines at one shared drawing scale (0.2467 m per SVG unit), placed by rotation and translation only"
  },
  {
   "url": "https://www.brno.cz/documents/20121/13420919/Materi%C3%A1l_101-101.pdf/9831375b-2983-f5a4-3432-1fb986923cd9?t=1764900181823",
   "owner": "Statutární město Brno",
   "revision": "ZZPD 12/2024 drawings 102_00 and 105_00, published December 2025 as item 101 pp. 38–40",
   "use": "Ground-floor footprints, the sunken 1.PP plaza, canopy column nodes, tree positions, paths and water feature"
  },
  {
   "url": "https://www.brno.cz/documents/20121/2313378/Materi%C3%A1l_153-153.pdf/4cbd7b77-878c-0e96-7f92-17dd7e95165f?t=1677011207885",
   "owner": "Statutární město Brno",
   "revision": "DÚR 03/2020 site plan, item 153 p. 74",
   "use": "Parapet and roof-structure levels used as height estimates; ±0.000 = 201.120 m Bpv datum"
  },
  {
   "url": "https://www.mtdigroup.com/project/dornych",
   "owner": "MTDI Group",
   "use": "Architecture and mixed-use topology"
  },
  {
   "url": "https://www.gemo.cz/reference/dornych-brno/",
   "owner": "GEMO",
   "use": "Canopy structure: lattice columns, vaults and ETFE"
  }
 ],
 "siteSources": [
  {
   "owner": "Statutární město Brno",
   "licence": "CC BY 4.0",
   "use": "Site envelope, retained municipal neighbours, source ground and the demolished-face list"
  },
  {
   "owner": "OpenStreetMap contributors",
   "licence": "ODbL",
   "url": "https://www.openstreetmap.org/copyright",
   "use": "Demolished Prior way 29239088 and five temporary construction fences"
  }
 ],
 "state": "Planned finished quarter; the real site is under construction (completion planned for 2027)",
 "estimates": "Upper floors of A and F, storey heights, roof equipment, facade dimensions and finishes, canopy geometry, garage portal size, paving zones, planting and tree species are estimates read from the sources. No public BIM, sections or elevations were found.",
 "resourceReuse": "Street trees, benches, lamps, bins and shrubs reuse the city's shared prop families; planting reuses the shared grass and perennial prototypes; the lawn uses the city grass scan. Their original credits apply.",
 "documentation": "docs/dornych/design.md and docs/dornych/references.md"
}
